Recent work

Before and after, from real jobs in your street.

Photographed on site, nothing staged. Switchboards, EV chargers, lighting and emergency make-safes.

Ceramic fuses → 12-way RCBO board — beforeBefore
Ceramic fuses → 12-way RCBO board — afterAfter
Ceramic fuses → 12-way RCBO boardDulwich Hill · terrace · one day
7kW wallbox, garage side wall
7kW wallbox, garage side wallRozelle · cable concealed in conduit
Pendant run over island bench
Pendant run over island benchNewtown · dimmable LED
Make-safe after ceiling leak
Make-safe after ceiling leakPetersham · 11:40pm callout
Sub-board for granny flat
Sub-board for granny flatMarrickville · three-phase supply
Three-phase 22kW install — beforeBefore
Three-phase 22kW install — afterAfter
Three-phase 22kW installBalmain · load study included
Outdoor floods + sensors
Outdoor floods + sensorsAshfield · IP65 rated
Full rewire, occupied house
Full rewire, occupied houseSummer Hill · staged over 6 days
Overhead service repair
Overhead service repairLeichhardt · after storm damage

Ultra-fast, 90+ PageSpeed optimized websites

Discuss Project